Copyright© 2018 Hengxing Plastic Construction Material Co.,Ltd all rights reserved . 粤ICP备12015317号 www.300.cn        粤公网安备 44060502003406

Wechat

Minsite

SUPPORT 

ABOUT US

PRODUCTS 

APPLICATIONS 

NEWS

CONTATC US

Add:Xingxian Industrial Zone, Shihshan Town, Nanhai District, Foshan (Dali to Zhaoqing 6 km away from Sanshui) {the 321 National Road}}
Zip code:528231 
Tel:+86-
0757-85597588   /    +86-0757-85513489
Fax:+86-0757-85555749

Website: http://www.nhhengxing.com

Alibaba:http://cbh3489.1688.com
Email:cbh@nhhengxing.com

NEWS CENTER

>
>
>
Hengxing PVC anticorrosive gutter-Polymer structure-Water and drainage without delay

Latest information

ragon Boat Festival
Release time:
2022-06-05
Hengxing PVC plastic steel roofing tile and photovoltaic modules are good companion
Hengxing products —— new and upgraded pvc planting gutter
2018 China (Guangzhou) international tile trade fair and tile industry exhibition Foshan Nanhai Hengxing plastic Construction Ma

Hengxing PVC anticorrosive gutter-Polymer structure-Water and drainage without delay

Release time:
2017/03/09
Heng Xing PVC anticorrosive polymer structure gutter takes PVC resin as the main raw material, collocation certain function assistant, after extrusion molding, it is the renewal substitute of iron flume, iron plate sink and glass fiber reinforced plastic tank.
This product has the advantages of flame-retardant, anticorrosion, portability, durability, high strength, acid resistance and alkali resistance, easy construction and so on. It can be widely used in drainage engineering of factory shed or steel structure workshop, warehouse, market and so on.
 
 
Hengxing PVC gutterfittings gutterflat seal: add seal at the end of the sink, make the whole sink more perfect, the appearance is more beautiful.
 
 
gutterflat connection: connect between trough body, convenient and fast.
Sealant with sealer: combine the seal with the sewer, convenient and easy to install, save money and material.
 
 
Features of water interface: connecting sink, falling in the middle, flexible collocation.
 
 
1、When installing the flume, the bottom support shall be made of iron and steel, and the base shall be in a straight line and 1.There is a supporting place within 8 meters.The sides of the sink shall be protected by an iron frame.
2、the two ends of the sink connection or connection should be supported by a bracket.
As shown below, there are two supporting points.
3、do not open holes in the tank body drainage, this will affect the service life of the sink, need special drainage fittings and pipes connected to the sewer.
4、the drainage outlet should be matched, it is recommended that every 6 meters to set up a drain.
5、The whole gutter shall be installed not more than 18 m. If it must be exceeded, the installation and drainage shall be carried out in sections.